7/12-A-1 B
Development, productionPluggedOil
Drilled by BP Amoco Norge AS with Ula Dp in Ula, 23.12.2000 to 07.02.2001 (46 days), to 4 776,0 m.
Water depth69,0 m
Total depth4 776,0 m MD
Vertical depth3 416,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Dp
Spud23.12.2000
Completed07.02.2001
OperatorBP Amoco Norge AS
Position57,1115 N, 2,8475 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 133 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-1 same well | 0,0 | 3 986,0 | - | - | 1988 |
| 7/12-A-1 A same well | 0,0 | 3 646,0 | - | - | 1991 |
| 7/12-A-1 C same well | 0,0 | 5 332,0 | - | - | 2014 |
| 7/12-A-7 | 0,0 | 3 904,0 | - | - | 1987 |
| 7/12-A-7 A | 0,0 | 4 088,5 | - | - | 1996 |
| 7/12-A-7 B | 0,0 | 5 852,0 | - | - | 2000 |
| 7/12-A-7 C | 0,0 | 4 600,0 | - | - | 2002 |
| 7/12-A-7 D | 0,0 | 4 862,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.