7/12-A-7 B
Development, productionPluggedOil
Drilled by BP Amoco Norge AS with Ula Dp in Ula, 22.07.2000 to 13.09.2000 (53 days), to 5 852,0 m.
Water depth69,0 m
Total depth5 852,0 m MD
Vertical depth3 452,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Dp
Spud22.07.2000
Completed13.09.2000
OperatorBP Amoco Norge AS
Position57,1115 N, 2,8474 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 134 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-7 same well | 0,0 | 3 904,0 | - | - | 1987 |
| 7/12-A-7 A same well | 0,0 | 4 088,5 | - | - | 1996 |
| 7/12-A-7 C same well | 0,0 | 4 600,0 | - | - | 2002 |
| 7/12-A-7 D same well | 0,0 | 4 862,0 | - | - | 2020 |
| 7/12-A-7 E same well | 0,0 | - | - | - | - |
| 7/12-A-1 | 0,0 | 3 986,0 | - | - | 1988 |
| 7/12-A-1 A | 0,0 | 3 646,0 | - | - | 1991 |
| 7/12-A-1 B | 0,0 | 4 776,0 | - | - | 2000 |
Casing and formation tests
No casing programme is reported for this wellbore.