7/12-A-12 A
Development, productionProducingOil
Drilled by BP Norway Limited U.A. with Ula Dp in Ula, 15.04.1990 to 31.05.1990 (46 days), to 4 655,0 m.
Water depth69,0 m
Total depth4 655,0 m MD
Vertical depth3 606,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Dp
Spud15.04.1990
Completed31.05.1990
OperatorBP Norway Limited U.A.
Position57,1114 N, 2,8475 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 140 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-12 same well | 0,0 | 4 093,0 | - | - | 1988 |
| 7/12-2 | 0,0 | 3 676,0 | 154 °C | 1,60 | 1976 |
| 7/12-2 R | 0,0 | 3 676,0 | - | - | 1984 |
| 7/12-A-6 | 0,0 | 3 708,0 | - | - | 1986 |
| 7/12-A-6 A | 0,0 | - | - | - | - |
| 7/12-A-18 | 0,0 | 3 815,0 | - | - | 1987 |
| 7/12-A-11 | 0,0 | 6 480,0 | - | - | 1993 |
| 7/12-A-11 A | 0,0 | 7 320,0 | - | - | 2020 |
Casing and formation tests
No casing programme is reported for this wellbore.