7/12-A-11 A
Development, injectionInjectingWater and gas
Drilled by Aker BP ASA with Maersk Integrator in Ula, 07.01.2020 to 27.03.2020 (80 days), to 7 320,0 m.
Water depth69,5 m
Total depth7 320,0 m MD
Vertical depth3 854,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table78,7 m
Formation at total depth-
RigMaersk Integrator
Spud07.01.2020
Completed27.03.2020
OperatorAker BP ASA
Position57,1114 N, 2,8475 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 149 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-11 same well | 0,0 | 6 480,0 | - | - | 1993 |
| 7/12-2 | 0,0 | 3 676,0 | 154 °C | 1,60 | 1976 |
| 7/12-2 R | 0,0 | 3 676,0 | - | - | 1984 |
| 7/12-A-5 | 0,0 | 5 088,0 | - | - | 1988 |
| 7/12-A-5 A | 0,0 | 5 853,0 | - | - | 1995 |
| 7/12-A-5 B | 0,0 | 5 391,0 | - | - | 2005 |
| 7/12-A-5 C | 0,0 | 4 580,0 | - | - | 2021 |
| 7/12-A-17 | 0,0 | 5 541,0 | - | - | 1991 |
Casing and formation tests
No casing programme is reported for this wellbore.