7/12-A-17
Development, productionPluggedOil
Drilled by BP Norway Limited U.A. with Ula Dp in Ula, 05.04.1991 to 12.09.1991 (160 days), to 5 541,0 m.
Water depth69,0 m
Total depth5 541,0 m MD
Vertical depth3 710,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Dp
Spud05.04.1991
Completed12.09.1991
OperatorBP Norway Limited U.A.
Position57,1114 N, 2,8475 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 144 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-17 A same well | 0,0 | 6 477,0 | - | - | 2003 |
| 7/12-A-17 B same well | 0,0 | 5 841,0 | - | - | 2009 |
| 7/12-A-16 | 0,0 | 5 222,0 | - | - | 1993 |
| 7/12-A-16 A | 0,0 | 4 522,0 | - | - | 1995 |
| 7/12-A-16 B | 0,0 | - | - | - | - |
| 7/12-2 | 0,0 | 3 676,0 | 154 °C | 1,60 | 1976 |
| 7/12-2 R | 0,0 | 3 676,0 | - | - | 1984 |
| 7/12-A-11 | 0,0 | 6 480,0 | - | - | 1993 |
Casing and formation tests
No casing programme is reported for this wellbore.