7/12-A-17 B
Development, injectionInjectingWater and gas
Drilled by BP Norge AS with Ula Pp in Ula, 07.12.2009 to 18.02.2010 (73 days), to 5 841,0 m.
Water depth69,5 m
Total depth5 841,0 m MD
Vertical depth3 789,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Pp
Spud07.12.2009
Completed18.02.2010
OperatorBP Norge AS
Position57,1114 N, 2,8475 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 147 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-17 same well | 0,0 | 5 541,0 | - | - | 1991 |
| 7/12-A-17 A same well | 0,0 | 6 477,0 | - | - | 2003 |
| 7/12-A-16 | 0,0 | 5 222,0 | - | - | 1993 |
| 7/12-A-16 A | 0,0 | 4 522,0 | - | - | 1995 |
| 7/12-A-16 B | 0,0 | - | - | - | - |
| 7/12-2 | 0,0 | 3 676,0 | 154 °C | 1,60 | 1976 |
| 7/12-2 R | 0,0 | 3 676,0 | - | - | 1984 |
| 7/12-A-11 | 0,0 | 6 480,0 | - | - | 1993 |
Casing and formation tests
No casing programme is reported for this wellbore.