7/12-A-16
Development, productionPluggedOil
Drilled by BP Norway Limited U.A. with Ula Dp in Ula, 02.03.1993 to 01.05.1993 (60 days), to 5 222,0 m.
Water depth69,0 m
Total depth5 222,0 m MD
Vertical depth3 716,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Dp
Spud02.03.1993
Completed01.05.1993
OperatorBP Norway Limited U.A.
Position57,1114 N, 2,8475 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 145 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-16 A same well | 0,0 | 4 522,0 | - | - | 1995 |
| 7/12-A-16 B same well | 0,0 | - | - | - | - |
| 7/12-A-17 | 0,0 | 5 541,0 | - | - | 1991 |
| 7/12-A-17 A | 0,0 | 6 477,0 | - | - | 2003 |
| 7/12-A-17 B | 0,0 | 5 841,0 | - | - | 2009 |
| 7/12-12 S | 0,0 | 6 079,0 | 152 °C | 1,66 | 1995 |
| 7/12-A-10 | 0,0 | 3 710,0 | - | - | 1986 |
| 7/12-A-10 A | 0,0 | 5 690,0 | - | - | 1997 |
Casing and formation tests
No casing programme is reported for this wellbore.