7/12-A-5 A
Development, productionPluggedOil
Drilled by BP Norway Limited U.A. with Ula Dp in Ula, 23.03.1995 to 18.06.1995 (87 days), to 5 853,0 m.
Water depth69,0 m
Total depth5 853,0 m MD
Vertical depth3 788,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Dp
Spud23.03.1995
Completed18.06.1995
OperatorBP Norway Limited U.A.
Position57,1114 N, 2,8476 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 147 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-5 same well | 0,0 | 5 088,0 | - | - | 1988 |
| 7/12-A-5 B same well | 0,0 | 5 391,0 | - | - | 2005 |
| 7/12-A-5 C same well | 0,0 | 4 580,0 | - | - | 2021 |
| 7/12-A-11 | 0,0 | 6 480,0 | - | - | 1993 |
| 7/12-A-11 A | 0,0 | 7 320,0 | - | - | 2020 |
| 7/12-A-3 | 0,0 | 3 955,0 | - | - | 1987 |
| 7/12-A-3 A | 0,0 | 4 088,0 | - | - | 1990 |
| 7/12-A-3 B | 0,0 | 4 892,0 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.