7/12-A-2
Development, productionPluggedOil
Drilled by BP Norway Limited U.A. with Ula Dp in Ula, 29.10.1986 to 20.12.1986 (52 days), to 3 787,0 m.
Water depth69,0 m
Total depth3 787,0 m MD
Vertical depth3 598,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table57,0 m
Formation at total depth-
RigUla Dp
Spud29.10.1986
Completed20.12.1986
OperatorBP Norway Limited U.A.
Position57,1115 N, 2,8475 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Ula gradient | 39,2 °C/km |
| Estimated at total depth from the gradient | 140 °C |
The gradient is the median of 8 released wells in Ula with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7/12-A-2 A same well | 0,0 | 3 892,0 | - | - | 1995 |
| 7/12-A-2 B same well | 0,0 | 5 374,0 | - | - | 2005 |
| 7/12-A-8 | 0,0 | 4 393,0 | - | - | 1989 |
| 7/12-A-8 A | 0,0 | 4 450,0 | - | - | 1994 |
| 7/12-A-1 | 0,0 | 3 986,0 | - | - | 1988 |
| 7/12-A-1 A | 0,0 | 3 646,0 | - | - | 1991 |
| 7/12-A-1 B | 0,0 | 4 776,0 | - | - | 2000 |
| 7/12-A-1 C | 0,0 | 5 332,0 | - | - | 2014 |
Casing and formation tests
No casing programme is reported for this wellbore.