Fields / 7/8-3
7/8-3
Exploration, wildcatPlugged and abandonedOil
Drilled by Conoco Norway Inc. with Borgny Dolphin, 12.09.1983 to 12.12.1983 (91 days), to 4 320,0 m in the Zechstein Group.
Water depth81,0 m
Total depth4 320,0 m MD
Vertical depth4 320,0 m TVD
Bottom-hole temperature172 °C
Max inclination-
Rotary table25,0 m
Formation at total depthZechstein Group
RigBorgny Dolphin
Spud12.09.1983
Completed12.12.1983
OperatorConoco Norway Inc.
Position57,2585 N, 2,5461 E
Formations
23 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 172 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 199,0 | 36" | 199,0 | - |
| Surface casing | 20" | 610,0 | 26" | 622,0 | 1,88 LOT |
| Intermediate | 13 3/8" | 1 981,0 | 17 1/2" | 1 995,0 | 1,65 LOT |
| Intermediate | 9 5/8" | 3 554,0 | 12 1/4" | 3 561,0 | 2,03 LOT |
| Liner | 7" | 3 827,0 | 8 1/2" | 4 320,0 | - |
Drill-stem tests
Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.
| Test | Interval, m | Choke | Pressure | Temp. | Oil | Gas |
|---|---|---|---|---|---|---|
| 2 | 3 734,0 - 3 741,0 | 50,0 | - | - | 70 | - |
| 1 | 3 762,0 - 3 767,0 | 50,0 | - | - | 207 | - |