Fields / 7/8-U-3
7/8-U-3
Other, soil drillingPlugged and abandoned
Drilled by LOTOS Exploration and Production Norge AS with Bucentaur, 29.09.2011 to 30.09.2011 (1 days), to 123,9 m.
Water depth81,8 m
Total depth123,9 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table2,9 m
Formation at total depth-
RigBucentaur
Spud29.09.2011
Completed30.09.2011
OperatorLOTOS Exploration and Production Norge AS
Position57,2990 N, 2,4554 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.