Fields / 7120/1-1 R
7120/1-1 R
Exploration, wildcatSuspendedOil and gas shows
Drilled by A/S Norske Shell with Borgny Dolphin, 02.12.1985 to 26.12.1985 (24 days), to 2 610,0 m in the Røye Formation.
Water depth342,0 m
Total depth2 610,0 m MD
Vertical depth2 609,0 m TVD
Bottom-hole temperature58 °C
Max inclination5,7°
Rotary table25,0 m
Formation at total depthRøye Formation
RigBorgny Dolphin
Spud02.12.1985
Completed26.12.1985
OperatorA/S Norske Shell
Position71,9169 N, 20,3020 E
Formations
15 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 58 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7120/1-1 same well | 0,0 | 2 569,0 | 58 °C | 1,37 | 1985 |
| 7120/1-1 R2 same well | 0,0 | 4 003,0 | 125 °C | 1,41 | 1986 |
| 7120/1-U-1 | 1,9 | 392,0 | - | - | 2013 |
| 7120/1-3 | 1,9 | 2 542,0 | 98 °C | 1,27 | 2013 |
| 7120/1-5 | 2,9 | 2 527,0 | 97 °C | 1,50 | 2017 |
| 7120/1-U-2 | 5,2 | 398,0 | - | - | 2014 |
| 7120/1-4 S | 5,2 | 2 520,0 | 97 °C | 1,21 | 2014 |
| 7120/2-1 | 9,5 | 3 502,0 | 97 °C | 1,55 | 1985 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Intermediate | 9 5/8" | 2 610,0 | 12 1/4" | 2 610,0 | 1,60 LOT |
Mud weight
16 measurements, one dot each, 1,30 to 1,37 g/cm³ against measured depth, water based.