Exploration, appraisalPlugged and abandonedGas

Drilled by Lundin Norway AS with Island Innovator, 23.05.2014 to 03.08.2014 (72 days), to 2 520,0 m in the Røye Formation.

Water depth331,5 m
Total depth2 520,0 m MD
Vertical depth2 520,0 m TVD
Bottom-hole temperature97 °C
Max inclination5,3°
Rotary table30,0 m
Formation at total depthRøye Formation
RigIsland Innovator
Spud23.05.2014
Completed03.08.2014
OperatorLundin Norway AS
Position71,9387 N, 20,1691 E

Formations

14 tops reported, measured depth in metres.

GroupsNordland Group, top 361,5 mNordland GpSotbakken Group, top 451,0 mSotbakken GpKapp Toscana Group, top 733,0 mKapp Toscana GpSassendalen Group, top 2 274,0 mUndefined Group, top 2 301,0 mTempelfjorden Group, top 2 313,5 mTempelfjorden GpFormationsUndifferentiated, top 361,5 mUndifferentiated, top 389,0 mTorsk Formation, top 451,0 mTorsk FmSnadd Formation, top 733,0 mSnadd FmKobbe Formation, top 2 274,0 mKlappmyss Formation, top 2 285,0 mUndifferentiated, top 2 301,0 mRøye Formation, top 2 313,5 mRøye Fm3625001 0001 5002 0002 5002 520

Temperature

Reported at total depth97 °C
Drill-stem test at 2 385,0 m90 °C

The wellbore is not in a field, so no field gradient applies.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
7120/1-U-20,0398,0--2014
7120/1-52,82 527,097 °C1,502017
7120/1-15,22 569,058 °C1,371985
7120/1-1 R5,22 610,058 °C1,371985
7120/1-1 R25,24 003,0125 °C1,411986
7120/1-35,32 542,098 °C1,272013
7120/1-U-15,3392,0--2013
7220/10-U-19,4830,0--2012

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"441,636"445,0-
Surface casing20"657,826"665,01,28 LOT
Pilot hole-675,09 7/8"675,0-
Intermediate13 3/8"1 217,017 1/2"1 226,01,59 FIT
Intermediate9 5/8"2 111,012 1/4"2 119,01,51 LOT
Liner7"2 520,08 1/2"2 520,0-

Mud weight

11 measurements, one dot each, 1,00 to 1,21 g/cm³ against measured depth, water based.

1,01,11,21,305001 0001 5002 0002 500361,0 m: 1,03 g/cm³, Water Based445,0 m: 1,04 g/cm³, Water Based480,0 m: 1,03 g/cm³, Water Based665,0 m: 1,20 g/cm³, Water Based840,0 m: 1,16 g/cm³, Water Based889,0 m: 1,20 g/cm³, Water Based1 157,0 m: 1,21 g/cm³, Water Based1 980,0 m: 1,16 g/cm³, Water Based2 119,0 m: 1,20 g/cm³, Water Based2 306,0 m: 1,16 g/cm³, Water Based2 520,0 m: 1,16 g/cm³, Water Based

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
12 295,0 - 2 385,020,6-90140700 000