Fields / 7120/8-U-4
7120/8-U-4
Other, shallow gasPlugged and abandoned
Drilled by StatoilHydro ASA with Polar Pioneer, 15.11.2007 to 15.11.2007 (0 days).
Water depth275,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud15.11.2007
Completed15.11.2007
OperatorStatoilHydro ASA
Position71,4770 N, 20,4459 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7120/8-4 | 0,0 | 2 697,0 | 98 °C | 1,30 | 2007 |
| 7120/8-3 | 5,7 | 2 335,0 | 58 °C | 1,38 | 1983 |
| 7120/8-1 | 7,5 | 2 610,0 | 95 °C | 1,45 | 1981 |
| 7120/8-J-1 AH | 8,6 | 3 210,0 | - | - | 2020 |
| 7120/8-J-1 H | 8,6 | 2 321,0 | - | - | 2019 |
| 7120/9-2 | 9,2 | 5 072,0 | 161 °C | 2,04 | 1984 |
| 7120/7-3 | 9,6 | 3 062,0 | 97 °C | 1,48 | 1984 |
| 7120/5-1 | 11,6 | 2 700,0 | 66 °C | 1,25 | 1985 |
Casing and formation tests
No casing programme is reported for this wellbore.