WellplannerNorwegian shelf well data

Fields / Snøhvit / 7120/8-1

7120/8-1

Exploration, wildcatPlugged and abandonedGas and condensate

Drilled by Den norske stats oljeselskap a.s with Ross Rig (1) in Snøhvit, 28.06.1981 to 10.09.1981 (74 days), to 2 610,0 m in the Fruholmen Formation.

Water depth270,0 m
Total depth2 610,0 m MD
Vertical depth2 610,0 m TVD
Bottom-hole temperature95 °C
Max inclination1,5°
Rotary table25,0 m
Formation at total depthFruholmen Formation
RigRoss Rig (1)
Spud28.06.1981
Completed10.09.1981
OperatorDen norske stats oljeselskap a.s
Position71,4096 N, 20,4351 E

Formations

16 tops reported, measured depth in metres.

GroupsNordland Group, top 295,0 mNordland GpSotbakken Group, top 603,0 mSotbakken GpNygrunnen Group, top 1 056,0 mNygrunnen GpAdventdalen Group, top 1 150,0 mAdventdalen GpKapp Toscana Group, top 2 092,0 mKapp Toscana GpFormationsTorsk Formation, top 603,0 mTorsk FmKveite Formation, top 1 056,0 mKveite FmKolmule Formation, top 1 150,0 mKolmule FmKolje Formation, top 1 650,0 mKolje FmKnurr Formation, top 1 942,0 mHekkingen Formation, top 1 990,0 mHekkingen FmFuglen Formation, top 2 086,0 mStø Formation, top 2 092,0 mStø FmNordmela Formation, top 2 190,0 mNordmela FmTubåen Formation, top 2 330,0 mTubåen FmFruholmen Formation, top 2 462,0 mFruholmen Fm2955001 0001 5002 0002 5002 610

Temperature

Reported at total depth95 °C
Drill-stem test at 2 172,0 m80 °C
Snøhvit gradient37,8 °C/km
Estimated at total depth from the gradient91 °C

The gradient is the median of 18 released wells in Snøhvit with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
7120/8-J-1 AH1,33 210,0--2020
7120/8-J-1 H1,32 321,0--2019
7120/8-47,52 697,098 °C1,302007
7120/8-U-47,5---2007
7120/8-L-4 H7,84 480,0--2019
7120/8-L-2 AH7,83 536,0--2020
7120/8-L-2 H7,82 248,0--2019
7120/8-28,12 590,091 °C1,451982

Casing and formation tests

The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.

StringCasingShoe, mHoleHole depth, mTest, g/cm³
Conductor30"357,036"359,0-
Surface casing20"735,026"750,01,49 LOT
Intermediate13 3/8"1 807,017 1/2"1 822,01,64 LOT
Intermediate9 5/8"2 593,012 1/4"2 610,0-

Mud weight

6 measurements, one dot each, 1,00 to 1,45 g/cm³ against measured depth, spud mud, water based.

1,01,11,21,31,41,505001 0001 5002 0002 500575,0 m: 1,04 g/cm³, spud mud1 086,0 m: 1,25 g/cm³, water based2 121,0 m: 1,40 g/cm³, water based2 181,0 m: 1,45 g/cm³, water based2 238,0 m: 1,36 g/cm³, water based2 610,0 m: 1,30 g/cm³, water based

Drill-stem tests

Choke in mm, bottom-hole pressure in bar, downhole temperature in °C, oil and gas in Sm³ per day.

TestInterval, mChokePressureTemp.OilGas
32 093,0 - 2 110,025,0-7850953 000
22 133,0 - 2 138,025,0-7227557 000
12 165,0 - 2 172,036,0-80481 049 000