7122/10-U-2
Other, shallow gasPlugged and abandoned
Drilled by Eni Norge AS with Scarabeo 8, 01.09.2017 to 02.09.2017 (1 days), to 578,0 m.
Water depth342,0 m
Total depth578,0 m MD
Vertical depth578,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud01.09.2017
Completed02.09.2017
OperatorEni Norge AS
Position71,1712 N, 22,2091 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7122/10-1 S | 0,1 | 1 525,0 | - | 1,28 | 2017 |
| 7122/10-I-4 H | 8,1 | 2 568,0 | - | - | 2017 |
| 7122/10-I-2 H | 8,1 | 2 510,0 | - | - | 2014 |
| 7122/10-U-1 | 8,1 | 574,0 | - | - | 2010 |
| 7122/10-E-1 H | 8,1 | 4 497,0 | - | - | 2016 |
| 7122/10-E-1 Y2H | 8,1 | 5 226,0 | - | - | 2026 |
| 7122/10-E-4 H | 8,2 | 4 413,0 | - | - | 2018 |
| 7122/10-E-2 H | 8,2 | 3 024,0 | - | - | 2015 |
Casing and formation tests
No casing programme is reported for this wellbore.