Fields / Goliat / 7122/7-G-2 H
7122/7-G-2 H
Development, injectionClosedWater
Drilled by Eni Norge AS with Scarabeo 8 in Goliat, 15.02.2016 to 07.03.2016 (21 days), to 1 660,0 m.
Water depth394,0 m
Total depth1 660,0 m MD
Vertical depth1 271,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table34,0 m
Formation at total depth-
RigScarabeo 8
Spud15.02.2016
Completed07.03.2016
OperatorEni Norge AS
Position71,3046 N, 22,3104 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Goliat gradient | 29,5 °C/km |
| Estimated at total depth from the gradient | 29 °C |
The gradient is the median of 5 released wells in Goliat with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7122/7-G-3 H | 0,0 | 2 035,0 | - | - | 2016 |
| 7122/7-G-1 H | 0,0 | 2 765,0 | - | - | 2021 |
| 7122/7-U-7 | 0,1 | 644,5 | - | - | 2010 |
| 7122/7-2 | 1,8 | 1 418,0 | 36 °C | 1,26 | 2001 |
| 7122/7-1 | 2,0 | 1 524,0 | 37 °C | 1,31 | 2000 |
| 7122/7-U-6 | 2,1 | 635,5 | - | - | 2010 |
| 7122/7-H-3 H | 2,2 | 2 230,0 | - | - | 2013 |
| 7122/7-H-2 H | 2,2 | 2 300,0 | - | - | 2017 |
Casing and formation tests
No casing programme is reported for this wellbore.