Fields / 7122/8-4 S
7122/8-4 S
Exploration, appraisalPluggedOil
Drilled by Vår Energi ASA with COSLProspector, 28.09.2025 to 25.10.2025 (27 days), to 2 986,0 m.
Water depth405,6 m
Total depth2 986,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table26,1 m
Formation at total depth-
RigCOSLProspector
Spud28.09.2025
Completed25.10.2025
OperatorVår Energi ASA
Position71,3635 N, 22,4047 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7122/8-3 A | 1,3 | 2 855,0 | - | - | 2025 |
| 7122/8-3 S | 1,3 | 2 570,0 | - | - | 2025 |
| 7122/7-8 | 4,8 | 2 218,0 | - | - | 2025 |
| 7122/7-U-1 | 5,1 | - | - | - | - |
| 7122/8-2 S | 5,3 | 3 235,0 | - | - | 2024 |
| 7122/8-1 A | 5,5 | - | - | - | - |
| 7122/8-1 B | 5,5 | - | - | - | - |
| 7122/8-1 S | 5,5 | 2 989,0 | 80 °C | 1,30 | 2022 |
Casing and formation tests
No casing programme is reported for this wellbore.