Fields / 7122/8-3 A
7122/8-3 A
Exploration, appraisalPluggedOil
Drilled by Vår Energi ASA with COSLProspector, 22.11.2025 to 26.12.2025 (34 days), to 2 855,0 m.
Water depth409,8 m
Total depth2 855,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table20,5 m
Formation at total depth-
RigCOSLProspector
Spud22.11.2025
Completed26.12.2025
OperatorVår Energi ASA
Position71,3546 N, 22,3829 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7122/8-3 S same well | 0,0 | 2 570,0 | - | - | 2025 |
| 7122/8-4 S | 1,3 | 2 986,0 | - | - | 2025 |
| 7122/7-8 | 3,5 | 2 218,0 | - | - | 2025 |
| 7122/7-U-1 | 3,8 | - | - | - | - |
| 7122/7-G-3 H | 6,1 | 2 035,0 | - | - | 2016 |
| 7122/7-G-2 H | 6,1 | 1 660,0 | - | - | 2016 |
| 7122/7-G-1 H | 6,1 | 2 765,0 | - | - | 2021 |
| 7122/7-U-7 | 6,2 | 644,5 | - | - | 2010 |
Casing and formation tests
No casing programme is reported for this wellbore.