Fields / 7219/6-1
7219/6-1
Exploration, wildcatPlugged and abandonedShows
Drilled by Vår Energi ASA with Transocean Enabler, 27.04.2024 to 28.05.2024 (31 days), to 1 652,0 m in the Kveite Formation.
Water depth399,0 m
Total depth1 652,0 m MD
Vertical depth1 651,9 m TVD
Bottom-hole temperature52 °C
Max inclination6,5°
Rotary table32,1 m
Formation at total depthKveite Formation
RigTransocean Enabler
Spud27.04.2024
Completed28.05.2024
OperatorVår Energi ASA
Position72,6917 N, 19,7703 E
Formations
5 tops reported, measured depth in metres.
Temperature
| Reported at total depth | 52 °C |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7219/6-U-1 | 0,0 | 880,0 | - | - | 2024 |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|---|---|---|---|---|
| Conductor | 30" | 493,6 | 36" | 495,0 | - |
| Intermediate | 13 3/8" | 801,8 | 17 1/2" | 870,0 | 1,31 FIT |
| Intermediate | 9 5/8" | 1 303,4 | 12 1/4" | 1 312,0 | 1,57 LOT |
| Open hole | - | 1 490,0 | 8 1/2" | 1 490,0 | - |