Fields / 7219/6-U-1
7219/6-U-1
Other, pilotPlugged
Drilled by Vår Energi ASA with Transocean Enabler, 26.04.2024 to 27.04.2024 (1 days), to 880,0 m.
Water depth399,0 m
Total depth880,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table32,1 m
Formation at total depth-
RigTransocean Enabler
Spud26.04.2024
Completed27.04.2024
OperatorVår Energi ASA
Position72,6915 N, 19,7704 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7219/6-1 | 0,0 | 1 652,0 | 52 °C | - | 2024 |
Casing and formation tests
No casing programme is reported for this wellbore.