Fields / Johan Castberg / 7220/8-1
7220/8-1
Exploration, wildcatPlugged and abandonedOil and gas
Drilled by Statoil Petroleum AS with Polar Pioneer in Johan Castberg, 27.02.2011 to 02.05.2011 (64 days), to 2 222,0 m in the Snadd Formation.
Water depth374,0 m
Total depth2 222,0 m MD
Vertical depth2 221,0 m TVD
Bottom-hole temperature-
Max inclination3,2°
Rotary table23,0 m
Formation at total depthSnadd Formation
RigPolar Pioneer
Spud27.02.2011
Completed02.05.2011
OperatorStatoil Petroleum AS
Position72,4914 N, 20,3340 E
Formations
14 tops reported, measured depth in metres.
Temperature
| Reported at total depth | - |
| Johan Castberg gradient | 37,3 °C/km |
| Estimated at total depth from the gradient | 72 °C |
The gradient is the median of 3 released wells in Johan Castberg with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|
| 7220/8-U-1 | 0,0 | 955,0 | - | - | 2011 |
| 7220/8-DA-3 Y1H | 0,7 | 2 711,0 | - | - | 2021 |
| 7220/8-DA-3 Y2H | 0,7 | 2 684,0 | - | - | 2022 |
| 7220/8-DA-2 H | 0,7 | 1 717,0 | - | - | 2021 |
| 7220/8-DA-4 AY1H | 0,7 | 2 493,0 | - | - | 2025 |
| 7220/8-DA-4 AY2H | 0,7 | 2 720,0 | - | - | 2025 |
| 7220/8-DA-4 Y1H | 0,7 | 2 255,0 | - | - | 2021 |
| 7220/8-DA-4 Y2H | 0,7 | - | - | - | - |
Casing and formation tests
The casing programme as reported, shallowest first. The test is the leak-off (LOT) or formation integrity (FIT) result as an equivalent mud density.
| String | Casing | Shoe, m | Hole | Hole depth, m | Test, g/cm³ |
|---|
| Conductor | 30" | 470,0 | 36" | 474,0 | - |
| Surface casing | 9 5/8" | 838,0 | 12 1/4" | 850,0 | 1,25 LOT |
| Liner | 7" | 1 251,0 | 8 1/2" | 1 252,0 | - |
| Open hole | - | 2 222,0 | 6" | 2 222,0 | - |
Mud weight
19 measurements, one dot each, 1,00 to 1,60 g/cm³ against measured depth, kcl/polymer/glycol, kill fluid- sw/bentonite, spud mud.