Fields / 7220/8-U-1
7220/8-U-1
Other, pilotPlugged and abandoned
Drilled by Statoil Petroleum AS with Polar Pioneer, 22.02.2011 to 26.02.2011 (4 days), to 955,0 m.
Water depth374,0 m
Total depth955,0 m MD
Vertical depth955,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table23,0 m
Formation at total depth-
RigPolar Pioneer
Spud22.02.2011
Completed26.02.2011
OperatorStatoil Petroleum AS
Position72,4915 N, 20,3336 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 7220/8-1 | 0,0 | 2 222,0 | - | 1,60 | 2011 |
| 7220/8-DA-2 H | 0,8 | 1 717,0 | - | - | 2021 |
| 7220/8-DA-3 Y1H | 0,8 | 2 711,0 | - | - | 2021 |
| 7220/8-DA-3 Y2H | 0,8 | 2 684,0 | - | - | 2022 |
| 7220/8-DA-4 AY1H | 0,8 | 2 493,0 | - | - | 2025 |
| 7220/8-DA-4 AY2H | 0,8 | 2 720,0 | - | - | 2025 |
| 7220/8-DA-4 Y1H | 0,8 | 2 255,0 | - | - | 2021 |
| 7220/8-DA-4 Y2H | 0,8 | - | - | - | - |
Casing and formation tests
No casing programme is reported for this wellbore.