Fields / 8/10-7 A
8/10-7 A
Exploration, wildcatWill never be drilled
A planned wellbore that the register says will never be drilled.
Water depth66,0 m
Total depth-
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table55,0 m
Formation at total depth-
RigMaersk Interceptor
Spud-
Completed-
OperatorSpirit Energy Norway AS
Position57,1152 N, 3,0587 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 8/10-7 S same well | 0,0 | 3 155,0 | - | 1,57 | 2018 |
| 8/10-1 | 2,1 | 3 089,0 | 101 °C | 1,72 | 1969 |
| 8/10-B-1 AH | 4,7 | 2 950,0 | - | - | 2022 |
| 8/10-B-1 H | 4,7 | 3 212,0 | - | - | 2018 |
| 8/10-B-3 AH | 4,7 | 2 905,0 | - | - | 2018 |
| 8/10-B-3 BH | 4,7 | - | - | - | - |
| 8/10-B-3 H | 4,7 | 2 641,0 | - | - | 2018 |
| 8/10-B-2 H | 4,7 | 3 640,0 | - | - | 2018 |
Casing and formation tests
No casing programme is reported for this wellbore.