8/10-B-3 AH
Development, productionProducingOil
Drilled by Spirit Energy Norge AS with Maersk Interceptor in Oda, 20.08.2018 to 31.08.2018 (11 days), to 2 905,0 m.
Water depth66,0 m
Total depth2 905,0 m MD
Vertical depth2 728,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table55,3 m
Formation at total depth-
RigMaersk Interceptor
Spud20.08.2018
Completed31.08.2018
OperatorSpirit Energy Norge AS
Position57,0731 N, 3,0652 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
1 released well in Oda report a bottom-hole temperature at 1,000 m or more below the sea floor; 3 are needed to estimate the temperature.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 8/10-B-3 BH same well | 0,0 | - | - | - | - |
| 8/10-B-3 H same well | 0,0 | 2 641,0 | - | - | 2018 |
| 8/10-B-2 H | 0,0 | 3 640,0 | - | - | 2018 |
| 8/10-B-1 AH | 0,0 | 2 950,0 | - | - | 2022 |
| 8/10-B-1 H | 0,0 | 3 212,0 | - | - | 2018 |
| 8/10-U-5 | 0,0 | 420,0 | - | - | 2015 |
| 8/10-4 A | 1,5 | 3 639,0 | - | 1,59 | 2011 |
| 8/10-4 B | 1,5 | 2 549,0 | - | 1,51 | 2011 |
Casing and formation tests
No casing programme is reported for this wellbore.