Fields / 8/10-U-5
8/10-U-5
Other, shallow gasPlugged and abandoned
Drilled by Centrica Resources (Norge) AS with Island Constructor, 27.09.2015 to 30.09.2015 (3 days), to 420,0 m.
Water depth66,0 m
Total depth420,0 m MD
Vertical depth420,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table3,0 m
Formation at total depth-
RigIsland Constructor
Spud27.09.2015
Completed30.09.2015
OperatorCentrica Resources (Norge) AS
Position57,0730 N, 3,0655 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
| Wellbore | km | Total depth, m | BHT | Mud max, g/cm³ | Year |
|---|---|---|---|---|---|
| 8/10-B-2 H | 0,0 | 3 640,0 | - | - | 2018 |
| 8/10-B-1 AH | 0,0 | 2 950,0 | - | - | 2022 |
| 8/10-B-1 H | 0,0 | 3 212,0 | - | - | 2018 |
| 8/10-B-3 AH | 0,0 | 2 905,0 | - | - | 2018 |
| 8/10-B-3 BH | 0,0 | - | - | - | - |
| 8/10-B-3 H | 0,0 | 2 641,0 | - | - | 2018 |
| 8/10-4 A | 1,5 | 3 639,0 | - | 1,59 | 2011 |
| 8/10-4 B | 1,5 | 2 549,0 | - | 1,51 | 2011 |
Casing and formation tests
No casing programme is reported for this wellbore.