9/2-B-3 H
Development, productionPlugged and abandonedOil
Drilled by Den norske stats oljeselskap a.s with Byford Dolphin in Yme, 22.04.1997 to 10.06.1997 (49 days), to 4 499,0 m.
Water depth77,0 m
Total depth4 499,0 m MD
Vertical depth3 395,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table25,0 m
Formation at total depth-
RigByford Dolphin
Spud22.04.1997
Completed10.06.1997
OperatorDen norske stats oljeselskap a.s
Position57,7542 N, 4,3560 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Yme gradient | 32,0 °C/km |
| Estimated at total depth from the gradient | 109 °C |
The gradient is the median of 4 released wells in Yme with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.