WellplannerNorwegian shelf well data

Fields / Yme / 9/2-C-1

9/2-C-1

Development, productionProducingOil

Drilled by Talisman Energy Norge AS with Mærsk Giant in Yme, 07.02.2009 to 13.11.2009 (279 days), to 5 260,0 m.

Water depth93,0 m
Total depth5 260,0 m MD
Vertical depth3 311,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table45,6 m
Formation at total depth-
RigMærsk Giant
Spud07.02.2009
Completed13.11.2009
OperatorTalisman Energy Norge AS
Position57,8161 N, 4,5354 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Yme gradient32,0 °C/km
Estimated at total depth from the gradient106 °C

The gradient is the median of 4 released wells in Yme with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
9/2-C-20,04 930,0--2009
9/2-C-2 A0,05 321,0--2010
9/2-C-30,05 240,0--2009
9/2-C-3 A0,06 475,0--2024
9/2-C-3 AY20,05 490,0--2024
9/2-C-60,05 448,0--2009
9/2-C-6 A0,0----
9/2-C-40,04 637,0--2009

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗