9/2-C-5
Development, injectionInjectingWater and gas
Drilled by Talisman Energy Norge AS with Mærsk Giant in Yme, 14.01.2009 to 20.08.2009 (218 days), to 4 913,0 m.
Water depth93,0 m
Total depth4 913,0 m MD
Vertical depth3 502,0 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table45,6 m
Formation at total depth-
RigMærsk Giant
Spud14.01.2009
Completed20.08.2009
OperatorTalisman Energy Norge AS
Position57,8160 N, 4,5354 E
Formations
No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.
Temperature
| Reported at total depth | - |
| Yme gradient | 32,0 °C/km |
| Estimated at total depth from the gradient | 112 °C |
The gradient is the median of 4 released wells in Yme with a reported bottom-hole temperature, counted from 4 °C at the sea floor.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.
Casing and formation tests
No casing programme is reported for this wellbore.