WellplannerNorwegian shelf well data

Fields / Yme / 9/2-C-9

9/2-C-9

Development, productionProducing

Drilled by Repsol Norge AS with Inspirer in Yme, 31.03.2023 to 18.09.2023 (171 days), to 5 780,0 m.

Water depth93,0 m
Total depth5 780,0 m MD
Vertical depth-
Bottom-hole temperature-
Max inclination-
Rotary table56,2 m
Formation at total depth-
RigInspirer
Spud31.03.2023
Completed18.09.2023
OperatorRepsol Norge AS
Position57,8160 N, 4,5354 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Yme gradient32,0 °C/km
Estimated at total depth from the gradient184 °C

The gradient is the median of 4 released wells in Yme with a reported bottom-hole temperature, counted from 4 °C at the sea floor. The vertical depth is not reported, so the measured depth is used and the estimate errs high.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
9/2-C-80,0826,0--2009
9/2-C-8 A0,06 359,0--2023
9/2-C-50,04 913,0--2009
9/2-C-5 A0,0----
9/2-100,0----
9/2-C-70,04 348,0--2009
9/2-C-7 A0,06 310,0--2023
9/2-C-60,05 448,0--2009

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗