WellplannerNorwegian shelf well data

Fields / Yme / 9/2-C-7 A

9/2-C-7 A

Development, injectionClosedWater and gas

Drilled by Repsol Norge AS with Inspirer in Yme, 01.12.2023 to 28.02.2024 (89 days), to 6 310,0 m.

Water depth93,0 m
Total depth6 310,0 m MD
Vertical depth3 318,1 m TVD
Bottom-hole temperature-
Max inclination-
Rotary table56,2 m
Formation at total depth-
RigInspirer
Spud01.12.2023
Completed28.02.2024
OperatorRepsol Norge AS
Position57,8160 N, 4,5354 E

Formations

No formation tops are reported for this wellbore. The register publishes tops for released exploration wells.

Temperature

Reported at total depth-
Yme gradient32,0 °C/km
Estimated at total depth from the gradient105 °C

The gradient is the median of 4 released wells in Yme with a reported bottom-hole temperature, counted from 4 °C at the sea floor.

Offset wells

The nearest wellbores within 15 km, straight-line distance at the surface.

WellborekmTotal depth, mBHTMud max, g/cm³Year
9/2-100,0----
9/2-C-7 same well0,04 348,0--2009
9/2-C-40,04 637,0--2009
9/2-C-80,0826,0--2009
9/2-C-8 A0,06 359,0--2023
9/2-C-30,05 240,0--2009
9/2-C-3 A0,06 475,0--2024
9/2-C-3 AY20,05 490,0--2024

Casing and formation tests

No casing programme is reported for this wellbore.

Show on the mapOpen on FactPages ↗