Drilled by ExxonMobil Exploration and Production Norway AS with Mærsk Gallant, 08.01.2006 to 01.08.2006 (205 days), to 5 881,0 m in the No Formal Name.
Water depth77,0 m
Total depth5 881,0 m MD
Vertical depth5 874,0 m TVD
Bottom-hole temperature150 °C
Max inclination8,5°
Rotary table44,0 m
Formation at total depthNo Formal Name
RigMærsk Gallant
Spud08.01.2006
Completed01.08.2006
OperatorExxonMobil Exploration and Production Norway AS
Position57,6775 N, 4,2690 E
Formations
25 tops reported, measured depth in metres.
Temperature
Reported at total depth
150 °C
The wellbore is not in a field, so no field gradient applies.
Offset wells
The nearest wellbores within 15 km, straight-line distance at the surface.