PL 019 E
ActiveProduction period
Production licence 019 E was granted 02.03.2018. It is in its production period and valid to 01.01.2029. Aker BP ASA is the operator, with two licensees in all.
Granted02.03.2018
Valid to01.01.2029
PhaseProduction period
Licensing roundTFO2017
Area granted6 km²
Area now4 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 80 % |
| DNO Norge AS | 20 % |
Fields
Part of Ula lies in this licence.
Wellbores
No wellbore in the register is drilled in PL 019 E.
Licensees over time
4 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | - | Aker BP ASA ; DNO Norge AS |
| 19.12.2019 | 16.12.2025 | Aker BP ASA ; DNO Norge AS (old) |
| 21.05.2019 | 18.12.2019 | Aker BP ASA ; DNO North Sea (Norge) AS |
| 02.03.2018 | 20.05.2019 | Aker BP ASA ; Faroe Petroleum Norge AS |