PL 025 C
ActiveProduction period, extended
Production licence 025 C was granted 06.05.2026. It is in its production period (extended) and valid to 10.09.2032. Equinor Energy AS is the operator, with two licensees in all.
Granted06.05.2026
Valid to10.09.2032
PhaseProduction period, extended
Licensing round2-A
Area granted13 km²
Area now13 km²
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 75 % |
| Vår Energi ASA | 25 % |
Wellbores
No wellbore in the register is drilled in PL 025 C.
Licensees over time
2 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 30.06.2026 | - | Equinor Energy AS ; Vår Energi ASA |
| 06.05.2026 | 29.06.2026 | Equinor Energy AS ; Vår Energi ASA ; OMV Norge AS ; Repsol Norge AS |