PL 027 HS
ActiveProduction periodDepth-limited in all or part
Production licence 027 HS was granted 07.06.2021. It is in its production period and valid to 01.03.2030. Vår Energi ASA is the operator, with two licensees in all.
Granted07.06.2021
Valid to01.03.2030
PhaseProduction period
Licensing round2-A
Area granted6 km²
Area now6 km²
Main areaNorth Sea
OperatorVår Energi ASA
Licensees
| Company | Interest |
|---|---|
| Vår Energi ASA operator | 90 % |
| Kistos Energy (Norway) AS | 10 % |
Fields
Part of Balder lies in this licence.
Wellbores
No wellbore in the register is drilled in PL 027 HS.
Licensees over time
4 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 10.06.2023 | - | Vår Energi ASA ; Kistos Energy (Norway) AS |
| 01.09.2022 | 09.06.2023 | Vår Energi ASA ; Mime Petroleum AS |
| 28.01.2022 | 31.08.2022 | Vår Energi ASA |
| 07.06.2021 | 27.01.2022 | Vår Energi AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Vår Energi ASA | 28.01.2022 | - |
| Vår Energi AS | 07.06.2021 | 27.01.2022 |