PL 1084
Inactive
Production licence 1084 was granted 19.02.2021. It ended 25.02.2025. The last operator was Aker BP ASA.
Granted19.02.2021
Ended25.02.2025
Phase-
Licensing roundTFO2020
Area granted25 km²
Area now-
Main areaNorth Sea
OperatorAker BP ASA
Licensees when it ended
| Company | Interest |
|---|---|
| Aker BP ASA operator | 60 % |
| DNO Norge AS (old) | 40 % |
Wellbores
No wellbore in the register is drilled in PL 1084.
Licensees over time
3 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 01.01.2023 | 25.02.2025 | Aker BP ASA ; DNO Norge AS (old) |
| 30.06.2022 | 31.12.2022 | ABP Norway AS ; DNO Norge AS (old) |
| 19.02.2021 | 29.06.2022 | Lundin Energy Norway AS ; DNO Norge AS (old) |
Operators over time
| Operator | From | To |
|---|---|---|
| Aker BP ASA | 01.01.2023 | 25.02.2025 |
| ABP Norway AS | 30.06.2022 | 31.12.2022 |
| Lundin Energy Norway AS | 19.02.2021 | 29.06.2022 |