PL 1102 B
ActiveInitial period
Production licence 1102 B was granted 15.03.2024. It is in its initial period and valid to 19.02.2028. OKEA ASA is the operator, with four licensees in all.
Granted15.03.2024
Valid to19.02.2028
PhaseInitial period
Licensing roundTFO2023
Area granted8 km²
Area now8 km²
Main areaNorth Sea
OperatorOKEA ASA
Licensees
| Company | Interest |
|---|---|
| OKEA ASA operator | 35 % |
| DNO Norge AS | 30 % |
| Aker BP ASA | 20 % |
| Equinor Energy AS | 15 % |
Wellbores
No wellbore in the register is drilled in PL 1102 B.
Licensees over time
3 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | - | OKEA ASA ; DNO Norge AS ; Aker BP ASA ; Equinor Energy AS |
| 29.08.2025 | 16.12.2025 | OKEA ASA ; DNO Norge AS (old) ; Aker BP ASA ; Equinor Energy AS |
| 15.03.2024 | 28.08.2025 | Aker BP ASA ; DNO Norge AS (old) ; Equinor Energy AS |
Operators over time
| Operator | From | To |
|---|---|---|
| OKEA ASA | 15.08.2025 | - |
| Aker BP ASA | 15.03.2024 | 14.08.2025 |