PL 1102 C
ActiveInitial period
Production licence 1102 C was granted 15.08.2025. It is in its initial period and valid to 19.02.2030. Equinor Energy AS is the operator, with two licensees in all.
Granted15.08.2025
Valid to19.02.2030
PhaseInitial period
Licensing roundTFO2020
Area granted218 km²
Area now218 km²
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 80 % |
| Aker BP ASA | 20 % |
Wellbores
No wellbore in the register is drilled in PL 1102 C.
Licensees over time
4 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 29.05.2026 | - | Equinor Energy AS ; Aker BP ASA |
| 17.12.2025 | 28.05.2026 | Equinor Energy AS ; DNO Norge AS ; Aker BP ASA |
| 29.08.2025 | 16.12.2025 | Equinor Energy AS ; DNO Norge AS (old) ; Aker BP ASA |
| 15.08.2025 | 28.08.2025 | Aker BP ASA ; DNO Norge AS (old) ; Equinor Energy AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Equinor Energy AS | 16.08.2025 | - |
| Aker BP ASA | 15.08.2025 | 15.08.2025 |