PL 1148 B
ActiveInitial period, extended
Production licence 1148 B was granted 17.02.2023. It is in its initial period (extended) and valid to 11.08.2029. Wellesley Petroleum AS is the operator, with four licensees in all.
Granted17.02.2023
Valid to11.08.2029
PhaseInitial period, extended
Licensing roundTFO2022
Area granted44 km²
Area now44 km²
Main areaNorth Sea
OperatorWellesley Petroleum AS
Licensees
| Company | Interest |
|---|---|
| DNO Norge AS | 30 % |
| Equinor Energy AS | 30 % |
| Wellesley Petroleum AS operator | 30 % |
| Aker BP ASA | 10 % |
Wellbores
No wellbore in the register is drilled in PL 1148 B.
Licensees over time
3 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | - | DNO Norge AS ; Equinor Energy AS ; Wellesley Petroleum AS ; Aker BP ASA |
| 30.06.2025 | 16.12.2025 | DNO Norge AS (old) ; Equinor Energy AS ; Wellesley Petroleum AS ; Aker BP ASA |
| 17.02.2023 | 29.06.2025 | Wellesley Petroleum AS ; DNO Norge AS (old) ; Aker BP ASA ; Equinor Energy AS |