PL 1190
Inactive
Production licence 1190 was granted 17.02.2023. It ended 16.02.2025. The last operator was Harbour Energy Norge AS.
Granted17.02.2023
Ended16.02.2025
Phase-
Licensing roundTFO2022
Area granted66 km²
Area now-
Main areaNorwegian Sea
OperatorHarbour Energy Norge AS
Licensees when it ended
| Company | Interest |
|---|---|
| Harbour Energy Norge AS operator | 50 % |
| Lime Petroleum AS | 30 % |
| ORLEN Upstream Norway AS | 20 % |
Wellbores
No wellbore in the register is drilled in PL 1190.
Licensees over time
4 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 23.12.2024 | 16.02.2025 | Harbour Energy Norge AS ; Lime Petroleum AS ; ORLEN Upstream Norway AS |
| 11.12.2024 | 22.12.2024 | Wintershall Dea Norge AS ; Lime Petroleum AS ; ORLEN Upstream Norway AS |
| 26.09.2024 | 10.12.2024 | Harbour Energy Norge AS (Old) ; Lime Petroleum AS ; ORLEN Upstream Norway AS |
| 17.02.2023 | 25.09.2024 | Harbour Energy Norge AS (Old) ; Lime Petroleum AS ; PGNiG Upstream Norway AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Harbour Energy Norge AS | 23.12.2024 | 16.02.2025 |
| Wintershall Dea Norge AS | 11.12.2024 | 22.12.2024 |
| Harbour Energy Norge AS (Old) | 17.02.2023 | 10.12.2024 |