PL 1200 S
ActiveInitial periodDepth-limited in all or part
Production licence 1200 S was granted 15.03.2024. It is in its initial period and valid to 15.03.2031. Equinor Energy AS is the operator, with two licensees in all.
Granted15.03.2024
Valid to15.03.2031
PhaseInitial period
Licensing roundTFO2023
Area granted353 km²
Area now353 km²
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 70 % |
| ORLEN Upstream Norway AS | 30 % |
Wellbores
No wellbore in the register is drilled in PL 1200 S.
Licensees over time
3 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 26.09.2024 | - | Equinor Energy AS ; ORLEN Upstream Norway AS |
| 18.06.2024 | 25.09.2024 | Equinor Energy AS ; PGNiG Upstream Norway AS |
| 15.03.2024 | 17.06.2024 | Equinor Energy AS ; Orlen Upstream Norway 2 AS |