PL 1207
ActiveInitial period
Production licence 1207 was granted 15.03.2024. It is in its initial period and valid to 15.03.2031. Aker BP ASA is the operator, with two licensees in all.
Granted15.03.2024
Valid to15.03.2031
PhaseInitial period
Licensing roundTFO2023
Area granted19 km²
Area now19 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 80 % |
| ConocoPhillips Skandinavia AS | 20 % |
Wellbores
No wellbore in the register is drilled in PL 1207.