PL 1212 S
InactiveDepth-limited in all or part
Production licence 1212 S was granted 15.03.2024. It ended 15.03.2026. The last operator was Equinor Energy AS.
Granted15.03.2024
Ended15.03.2026
Phase-
Licensing roundTFO2023
Area granted63 km²
Area now-
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees when it ended
| Company | Interest |
|---|---|
| DNO Norge AS | 40 % |
| Equinor Energy AS operator | 40 % |
| Aker BP ASA | 20 % |
Wellbores
No wellbore in the register is drilled in PL 1212 S.
Licensees over time
4 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | 15.03.2026 | DNO Norge AS ; Equinor Energy AS ; Aker BP ASA |
| 09.10.2025 | 16.12.2025 | DNO Norge AS (old) ; Equinor Energy AS ; Aker BP ASA |
| 22.07.2024 | 08.10.2025 | DNO Norge AS (old) ; Equinor Energy AS ; Japex Norge AS |
| 15.03.2024 | 21.07.2024 | DNO Norge AS (old) ; Equinor Energy AS ; Longboat Japex Norge AS |