PL 1215
Inactive
Production licence 1215 was granted 15.03.2024. It ended 15.03.2026. The last operator was Aker BP ASA.
Granted15.03.2024
Ended15.03.2026
Phase-
Licensing roundTFO2023
Area granted136 km²
Area now-
Main areaNorth Sea
OperatorAker BP ASA
Licensees when it ended
| Company | Interest |
|---|---|
| Aker BP ASA operator | 40 % |
| Equinor Energy AS | 30 % |
| Vår Energi ASA | 30 % |
Wellbores
No wellbore in the register is drilled in PL 1215.