PL 1265
ActiveInitial period
Production licence 1265 was granted 14.03.2025. It is in its initial period and valid to 14.03.2032. Equinor Energy AS is the operator, with two licensees in all.
Granted14.03.2025
Valid to14.03.2032
PhaseInitial period
Licensing roundTFO2024
Area granted202 km²
Area now202 km²
Main areaNorwegian Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 60 % |
| Vår Energi ASA | 40 % |
Wellbores
No wellbore in the register is drilled in PL 1265.