PL 128 E
ActiveProduction period
Production licence 128 E was granted 10.02.2017. It is in its production period and valid to 01.04.2043. Equinor Energy AS is the operator, with three licensees in all.
Granted10.02.2017
Valid to01.04.2043
PhaseProduction period
Licensing roundTFO2016
Area granted95 km²
Area now25 km²
Main areaNorwegian Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 63,955 % |
| Petoro AS | 24,545 % |
| DNO Norge AS | 11,500 % |
Petoro AS holds the share of the State's Direct Financial Interest (SDFI).
Fields
Part of Verdande lies in this licence.
Wellbores
No wellbore in the register is drilled in PL 128 E.
Licensees over time
6 sets of licensees since the licence was granted, newest first. A change of company name counts as a change.
Show the history
| From | To | Licensees and interests |
|---|---|---|
| 17.12.2025 | - | Equinor Energy AS ; Petoro AS ; DNO Norge AS |
| 30.08.2024 | 16.12.2025 | Equinor Energy AS ; Petoro AS ; DNO Norge AS (old) |
| 28.01.2022 | 29.08.2024 | Equinor Energy AS ; Petoro AS ; Vår Energi ASA |
| 10.12.2018 | 27.01.2022 | Equinor Energy AS ; Petoro AS ; Vår Energi AS |
| 16.05.2018 | 09.12.2018 | Equinor Energy AS ; Petoro AS ; Eni Norge AS |
| 10.02.2017 | 15.05.2018 | Statoil Petroleum AS ; Petoro AS ; Eni Norge AS |
Operators over time
| Operator | From | To |
|---|---|---|
| Equinor Energy AS | 16.05.2018 | - |
| Statoil Petroleum AS | 10.02.2017 | 15.05.2018 |