PL 1283
ActiveInitial period
Production licence 1283 was granted 20.03.2026. It is in its initial period and valid to 20.03.2033. Equinor Energy AS is the operator, with two licensees in all.
Granted20.03.2026
Valid to20.03.2033
PhaseInitial period
Licensing roundTFO2025
Area granted1 897 km²
Area now1 897 km²
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 60 % |
| Aker BP ASA | 40 % |
Wellbores
No wellbore in the register is drilled in PL 1283.