PL 1284
ActiveInitial period
Production licence 1284 was granted 20.03.2026. It is in its initial period and valid to 20.03.2032. Aker BP ASA is the operator, with three licensees in all.
Granted20.03.2026
Valid to20.03.2032
PhaseInitial period
Licensing roundTFO2025
Area granted39 km²
Area now39 km²
Main areaNorth Sea
OperatorAker BP ASA
Licensees
| Company | Interest |
|---|---|
| Aker BP ASA operator | 40 % |
| DNO Norge AS | 30 % |
| Equinor Energy AS | 30 % |
Wellbores
No wellbore in the register is drilled in PL 1284.