Production licence 1293 was granted 20.03.2026. It is in its initial period and valid to 20.03.2032. Equinor Energy AS is the operator, with two licensees in all.
Granted20.03.2026
Valid to20.03.2032
PhaseInitial period
Licensing roundTFO2025
Area granted95 km²
Area now95 km²
Main areaNorth Sea
OperatorEquinor Energy AS
Licensees
| Company | Interest |
|---|---|
| Equinor Energy AS operator | 60 % |
| OKEA ASA | 40 % |
Wellbores
No wellbore in the register is drilled in PL 1293.