PL 1294 S
ActiveInitial periodDepth-limited in all or part
Production licence 1294 S was granted 20.03.2026. It is in its initial period and valid to 20.03.2032. Petrolia NOCO AS is the operator, with two licensees in all.
Granted20.03.2026
Valid to20.03.2032
PhaseInitial period
Licensing roundTFO2025
Area granted178 km²
Area now178 km²
Main areaNorth Sea
OperatorPetrolia NOCO AS
Licensees
| Company | Interest |
|---|---|
| Petrolia NOCO AS operator | 70 % |
| Equinor Energy AS | 30 % |
Wellbores
No wellbore in the register is drilled in PL 1294 S.